StitchAndGrid My projects Make a pattern

Cross stitch calculators › Finish date calculator

Cross stitch finish date calculator

Stitching for a birthday, a wedding or a new baby? Enter the date and see what each stitching day has to hold. Or leave the date empty and see when your usual pace gets you there.

  • Stitches leftof
  • Each stitching day
  • Stitching days before the date
  • At your usual pace

At your usual hours you would finish after the date. The line “Each stitching day” shows what it takes to be on time.

That date has passed. Choose a date in the future, or clear it.

Leave empty if you do not know
Used only when the box on the left is empty
Leave empty if you have not started
Leave empty to see when a steady pace gets you there
Used when no date is set

Your project is kept on this device and follows you to the other calculators.

How to use it

  1. Enter the pattern size and stitch count, or say how full the design is.
  2. Enter the stitches you have already made, if you have started. The pattern maker’s “Stitch along” view counts them for you.
  3. Choose the date the piece must be finished. Leave a week before the event for washing, pressing and framing.
  4. Say how many days a week you stitch, and your speed. A hundred to a hundred and fifty stitches an hour is common; time yourself over ten minutes to know yours.
  5. Print the plan. Under the answers is a week-by-week table with the stitches for each week, the running total and a box to tick. Pin it by your chair.

A worked example

A sampler of 4,800 stitches is for a wedding in six weeks. You stitch five days a week at 120 stitches an hour.

Mistakes that are easy to avoid

Questions people ask

How long does a cross stitch take?

Divide the stitch count by your speed. At 120 stitches an hour, 5,000 stitches is about 42 hours. Spread over an hour a day, five days a week, that is a little over eight weeks.

How many stitches can I do in a day?

Most people manage 100 to 150 full cross stitches an hour once a project is under way, so an hour a day is 100 to 150 stitches. Large blocks of one color go faster; scattered colors go slower.

What if the plan asks for too much each day?

Three things can change: stitch more days a week, choose a smaller or less full design, or move the date. The calculator shows the effect of each straight away.

Does this include framing time?

No. It is stitching time only. Leave at least a week between the finish date you enter and the day the piece is needed.

Next step